Epaper ☀️ 🌐 English বাংলা Russian Hindi Chinese
×

Follow Us

Opinion

Sudden Flood from Tibet Ravages Rasuwa, Nepal Steps Up Emergency Response

Sharachchandra Bhandary, Kathmandu

Published: 26 Aug 2026, 03:15 PM

Sudden Flood from Tibet Ravages Rasuwa, Nepal Steps Up Emergency Response
A A

A sudden and powerful flood entering Nepal from the Tibetan side of the border swept through parts of Rasuwa on Wednesday morning, causing extensive damage to settlements, roads, bridges and hydropower infrastructure and triggering emergency measures along the downstream Bhote Koshi-Trishuli river corridor.

The flood struck the Timure and Syaphrubesi areas of Rasuwa at around 9am, with the force of the water causing widespread destruction. Several people have been reported dead, while others, including security personnel stationed in the border area, remain unaccounted for. The casualty and damage figures are still being assessed as rescue teams continue their operations.

The flood subsequently moved downstream through the Bhote Koshi and Trishuli rivers, prompting authorities in Nuwakot, Dhading and other downstream areas to issue warnings and urge residents living close to the riverbanks to move to safer and higher ground.

Government mobilises full emergency response

The government has activated its full disaster-response mechanism to rescue affected people, relocate communities at risk and provide emergency relief.

Prime Minister Balendra Shah has directed the Nepal Army, Armed Police Force and Nepal Police to intensify search, rescue and relief operations, with additional security personnel being sent towards the affected areas.

The National Disaster Risk Reduction and Management Authority has also been mobilised to coordinate the emergency response. Medical teams and other emergency personnel are being deployed to assist affected communities.

Nepal Army helicopters equipped with medical and rescue teams have been deployed for search and rescue operations, while additional aerial resources have been kept ready as required.

Authorities in vulnerable downstream areas have been instructed to relocate residents from low-lying and high-risk settlements to safer locations. Emergency warnings have also been issued to communities along the river corridor as the flood moves downstream.

The government has urged people to avoid unnecessary travel along vulnerable sections of major highways and roads in the affected region because of continuing risks from flooding and landslides.

The government and relevant disaster-management agencies are continuously assessing the situation and coordinating rescue, relocation, relief and rehabilitation efforts.

Major infrastructure damage

The disaster has severely affected transportation infrastructure in northern Nepal. The road connecting Betrawati in Nuwakot with the Rasuwagadhi border has been damaged at several points, while bridges and other structures have reportedly been swept away.

Several hydropower projects and related infrastructure have also been damaged. Preliminary estimates indicate that around 430 megawatts of electricity-generation capacity has been affected.

The damage has raised concerns about disruption to electricity generation, transport links and cross-border trade through the Rasuwagadhi-Kerung route.

Cause remains under investigation

The precise cause of the sudden surge has not yet been established.

The flood entered the Bhote Koshi from the Tibetan side, while rainfall recorded in Rasuwa itself does not appear sufficient to explain the scale and suddenness of the event. Reports indicate significant rainfall on the Tibetan side.

A glacial lake outburst flood (GLOF) is among the possibilities being examined, particularly because a major flood in the same river system last year was associated with the drainage of a glacial lake in Tibet. However, authorities have yet to confirm that Wednesday's disaster was caused by a GLOF.

The Gyirong area on the Chinese side of the border has also reportedly been affected by a major mudslide, disrupting roads, communications and electricity. Whether that incident is directly connected to the flood that entered Nepal remains to be established.

The latest disaster once again highlights the vulnerability of Himalayan river systems to sudden transboundary hazards and the importance of effective cross-border monitoring, information sharing and early-warning mechanisms.

For now, the government's immediate priority remains saving lives, evacuating people from vulnerable areas, providing emergency medical and relief assistance, and assessing the full extent of the destruction.

The situation remains fluid, and casualty and damage figures are expected to be updated as search and rescue operations continue.

Read More