PM directs comprehensive green infrastructure for Chinese EZ in Anwara
BSS, Dhaka
Published: 16 Jun 2026, 05:04 PM
Photo: PMO
Prime Minister Tarique Rahman on Tuesday directed the authorities concerned to ensure a comprehensive waste management system and mandatory integration of renewable energy in the Chinese Economic and Industrial Zone in Anwara upazila of Chattogram.
The directives came during a meeting of the
Executive Committee of the National Economic Council (ECNEC), where the
‘Supporting Infrastructure Project for Chinese Economic and Industrial Zone'
project was approved conditional upon addressing environmental issues and
incorporating sustainable energy solutions into the project design.
State Minister for Planning Zonayed Abdur
Rahim Saki disclosed the information while briefing reporters at NEC Conference
room in the city following the ECNEC meeting held at the Cabinet Division in
the city.
The ECNEC approved the "Supporting
Infrastructure Project for Chinese Economic and Industrial Zone" at an
estimated cost of Tk4,189.4597 crore, aimed at accelerating industrialisation
and attracting foreign investment.
Of the total project cost of Tk4,189.4597
crore, the government will provide Tk1,722.1985 crore, while Tk2,467.2612 crore
will come from project loans and grants.
During the review of the project proposal,
the Prime Minister emphasised the need to strengthen environmental safeguards
and instructed the implementing agencies to incorporate several key measures
before execution.
He directed the establishment of a
full-fledged waste management system to ensure that all industrial waste is
handled in accordance with modern environmental standards and protocols.
The Prime Minister also ordered the
installation of an advanced Effluent Treatment Plant (ETP), stressing that the
treated water must be reusable after purification.
He instructed officials to address
shortcomings in the original proposal and ensure that no environmental gaps
remain in the project design.
In addition, he made the integration of
solar-based renewable energy a mandatory component of the project.
He directed that solar panels be installed
across the industrial zone to promote the use of clean and sustainable energy.
The State Minister for Planning said the
project has been approved subject to the incorporation of the Prime Minister’s
directives regarding waste management, advanced water treatment and reuse
facilities, and renewable energy integration during the implementation phase.
He added that the implementing agencies would
be required to reflect these environmental and sustainability measures in the
final project execution plan.