Epaper ☀️ 🌐 English বাংলা Russian Hindi Chinese
×

Follow Us

Bangladesh

2,142 rental-based flats to be built in Tongi for low-income people

BSS, Dhaka

Published: 29 Nov 2026, 12:50 PM

2,142 rental-based flats to be built in Tongi for low-income people
A A

The National Housing Authority has launched an initiative to construct 2,142 rental-based flats for low-income people in Tongi, Gazipur, with the aim of easing housing pressure in the capital Dhaka.

The primary objective of building these rental-based flats is to develop planned residential settlements equipped with civic amenities near the capital. This will create alternative living options outside Dhaka's main urban core.

Establishing new residential areas, which will be well-connected to the capital by road, will help cut housing pressure on the city. Furthermore, this will facilitate planned urban expansion, serving as an alternative to the unplanned urbanisation currently seen on the outskirts of Dhaka.

Chairman of the National Housing Authority Most. Ferdousi Begum said: "We are prioritising the development of planned settlements with civic amenities in the vicinity of the capital to reduce housing pressure. In addition, we are planning housing projects specifically designed to allow low-income people to live in a better environment at an affordable rent."

She said the initiative is being undertaken in Tongi to address the housing needs of low-income groups.

Instead of purchasing flats, residents will have the option to live there by paying a monthly rent, she said, adding that this would enable these families to reside in a well-planned housing environment without the need for a large, one-time capital expenditure.

The project is proposed to be implemented in phases, with the first phase covering 17.06 acres of a 98.13-acre plot owned by the National Housing Authority in Ward 49 of the Gazipur City Corporation. Seventeen 15-storey residential buildings will be constructed there.

Each building will contain 126 flats, totaling 2,142 units. Each flat will have an area of ??515 square feet. The proposed monthly rent is Taka 5,500, which includes charges for management, maintenance, and repairs, according to official sources.

The estimated cost of the project, including the value of the land, is about Taka 1,488.80 crore. Of the amount, the government funding of taka 1,272.62 crore has been proposed. The proposed implementation period is from July 2026 to June 2030.

In addition to residential buildings, the project includes internal roads, water supply, sewage systems, waste management, elevators, solar power, and fire safety measures.

Ahmed Abdullah Noor, executive engineer of the authority and project director, said the first phase of the Tongi project includes plans for rental housing for 2,142 families. Infrastructure for water, sewage, and security has been integrated into the development to ensure essential services for the residents, he said.

The National Housing Authority currently has 15 ongoing projects aimed at providing affordable housing for low- and middle-income people. These initiatives involve the construction of 6,215 flats and the development of 531 plots.

Two of these projects are government-funded, while 13 are being implemented through the authority's own funds. A prospectus for nine new projects has been submitted to the ministry for allocation.

Simultaneously, there is a plan to construct 2,142 rental-based flats in the first phase at Dattapara, Tongi. Also, plans are underway to develop 'secondary cities' in Keraniganj and Dhamrai to minimise pressure on the capital.


Besides, the National Housing Authority manages 66 housing estates across 38 districts and eight upazilas within the country's eight administrative divisions. To the date, 53 projects have been completed, resulting in the development of 6,024 plots and the construction of 6,576 flats.

Emphasis is being placed on expanding planned housing into the country's districts and upazilas. Efforts are currently underway to collect data and relevant official gazettes to establish a 'land bank', which will facilitate efficient land management and the planning of future projects.

To ensure optimal land use, the focus is given on multi-storey residential developments, earthquake-resistant structures, well-planned drainage systems, water reservoirs, green parks, and open spaces.

In plot development projects, 50 to 55 percent of the land is reserved for common services and civic amenities. The planned housing project includes provisions for playgrounds, green spaces, community areas, and access to safe drinking water. The objective is to create affordable, safe, and healthy housing equipped with civic amenities.

Read More
Advertisement